PERT (Program Evaluation and Review Technique) is a most commonly used project management method which was developed in connection with a Research and Development (R&D) work. Therefore, it had to cope with the uncertainties that are associated with R&D activities. In PERT, the total project duration is regarded as a random variable. Therefore, associated probabilities are calculated in order to characterize it.

CPM (Critical Path Method) is a project planning method  developed mainly in connection with a construction project, which consisted of routine tasks whose resource requirements and duration were known with certainty. Therefore, it is basically deterministic.


PERT

CPM


  • Used  mainly in R&D works where projects carry uncertainties.

  • Mostly used in construction related projects where tasks are repetitive and routine.

  • Total project duration are taken as random variables and can not be estimated easily.

  • Total project duration can be estimated with certainty since activities involves routine tasks.

  • This method mainly uses event oriented network.

  • This method mostly uses activity oriented network.

  • A Probabilistic model is used in this method.

  • A Deterministic model is used in this planning method.

    • It is tool for planning and controlling of cost and time is difficult to achieve because of probabilistic nature.

  • This method can achieve of controlling  both cost and time.

  • In this model to minimize the cost time management is of prime importance. Here cost depends directly with time and hence project duration (time) becomes the  controlling factor.

  • In this method project completion time is depended on controlling cost by cost optimizing. Here cost does not vary in direct proportion to time. Hence project cost becomes the controlling factor.