Advanced scheduling
Advanced scheduling in APS is done to prepare the list of the operations, in terms of which the operation is to be worked on, at which work centre and at what time. Input of advanced scheduling includes all the demands that needs to be met and additional orders added during advanced planning. The detailed information required by the advanced scheduling is as follows:
- The run time variables based on machine and actual assigned operator.
- Rules of machine and operation selection based on the skills and quality required.
- Set up time for the variables based on the previous experience.